天天色|天天操|天天射综合网|天天色综合网|97色色|97色色在线影院久久人人97超碰人人证监会:尽快修改完善《证券法》《刑法》

發布時間︰

  結果,發現雲瑯所有的故事都來自元朔二年,之前的所有事情都不可考。   對于羌人,雲瑯已經策劃很久了,現在不過是到了收割果實的時候,秋天到了,果子好不好,都該摘下來。天天色|天天操|天天射综合网|天天色综合网|97色色|97色色在线影院   留下督造獨石城的人正是李勇。久久人人97超碰   紅袖抬頭看著雲瑯道︰“我喜歡人間,不喜歡仙人。”   這個時候本應該抱著唇亡齒寒的想法共渡難關,他們毫不猶豫的選擇了從別人的尸體上攫取自己的利益。人人   他用自己肥厚的手掌拍著麻布堆笑道︰“想要哪一種?”
Previous Next

project at a glance

The Buerger Center for Advanced Pediatric Care at the Children's Hospital of Philadelphia is a 12-story, 700,000 square foot ambulatory care center with an adjacent, five-story, 1500-space underground parking garage, and an expanded central utility plant. The Center houses various ambulatory care clinics supporting outpatient diagnostics and specialty care services.  It is located beside the Colket Translational Research Building, which was also built by Turner.

Turner performed one of the largest excavations of its kind in the city of Philadelphia in order to prepare this site for the facility. Over the course of the nine-month excavation, the team excavated 70 feet down and hauled out roughly 300,000 cubic yards of rock.

In addition to building a world-class pediatric care facility, the project involved the construction of the largest green roof in Philadelphia, a sprawling 3-acre landscaped plaza.  Constructed on the roof level of the parking garage, the plaza incorporates local trees, shrubs, and flowering plants as well as four separate water fountains to create a setting that rivals a botanical garden.  The plaza alone took nearly 145,000 man-hours to complete and includes 166 trees, 3,635 shrubs, 16,366 perennials, 6,000 cubic yards of planting soil and stone mix, 30,000 square feet of stone pavers, and 10,000 square feet of stone cladding.

The project  achieved LEED Gold certification.

View this project in Turner City 2015.

Make a 3D print of the Buerger Center for Advanced Pediatric Care.

For Services / Specializations
and Additional Key Contacts
See Office Network

*Office includes a Special
Projects Division or Interiors
Group